Automated use of wired measures in grid planning for solving current and voltage band problems

Kraus H., Brückl O. (2019): Automated use of wired measures in grid planning for solving current and voltage band problems, Power and Energy Student Summit, 09-11.07.2019, Magdeburg.

Abstract

This work deals with the use of cable exchange and parallel cabling as network expansion measures in the context of an automated grid planning for the elimination of current and voltage band problems in a distribution network. Inter alia, reference is made to a higher-level program, which is being developed in the EU project „CrossEnergy“, and the procedures for remedying the limit value violations are presented.

Voltage band course with an overvoltage problem (green dashed lines represent voltage limits) and the vizualization of the starting (red) and further line sections (orange) of a parallel cabling for solving the problem